P&A provided an analysis and design of the City of St. Augustine sewer forcemain and pump station system for the special service overlay area which includes Sebastian Cove, Northridge Lakes, Old Sebastian Point and Whispering Creek PUDs. P&A conducted a study of the existing sewer system, existing pump stations and existing routes to provide the most feasible, economical and expedient solution for the proposed sewer forcemain route and connection point. P&A obtained all the required permits for the project from St. Johns County, the Army Corps of Engineers, the Department of Environmental Protection, Florida East Coast Railway, and Florida Department of Transportation. P&A has currently been performing Construction Management Services for the project. The key element of this project has been the outstanding coordination with permitting agencies and all parties involved, which resulted in an unexpectedly quick turnaround for permits as well as meeting all deadlines and goals. |
P&A did the design and permitting for this upscale office park in St. Augustine, purchased one of the buildings, and relocated its offices there in 2006. Located on the north side of SR 16 opposite Royal St. Augustine, the new office park houses offices of Century 21 Realty, Ancient City Insurance, and Geomatics Surveyors, among others. The park provides a unique “one-stop shop” that conveniently serves commercial and residential development needs in a single location. |
Client: TECO - Peoples GasLocation: Duval & St. Johns Counties, Florida Timeline: April 2007- Present & April - November 2000 2007 P&A is providing full service support from concept design, construction plan, permitting and construction management to put a new gas pipeline in St. Augustine for TECO Peoples Gas.The projected date of putting the line into service is December, 2007. 2000 P&A's services to Peoples Gas included environmental review of design plans, field assessment, and coordination with environmental agencies, including those of St. Johns County, Florida Department of Environmental Regulation, and U.S. Army Corps of Engineers, on permitting issues and alternatives to minimize environmental impacts and permitting constraints. |
Approximate File Size: 402.28KB (57Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |
Client: St. Johns Housing PartnershipLocation: Butler Avenue Timeline: 2001-2007 P&A provided a wide variety of engineering services from the initial due diligence to the final construction plans, required permitting, and construction management of this affordable housing subdivision. P&A is currently coordinating with the University of Florida IFAS program to design and permit an ecologically enhanced pond for the subdivision. |
Approximate File Size: 292.82KB (41Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |
Client: Northridge Lakes, LLCLocation: St. Johns County Timeline: June 2003 - present P&A has performed the following variety of services for this 662-unit development, which includes 131 town homes, 264 condominiums, and 367 single-family homes: due diligence, site plan, construction plans, permitting, and project management. P&A is also the District Engineer on the project for the Northridge Lakes Community Development District. |
Client: St. Johns CountyLocation: St. Augustine South Timeline: August 2002 - March 2007 In 2002, P&A conducted a comprehensive study of the bluff erosion along Moultrie Creek and prepared a report for St. Johns County to assess options for solutions to the problem. P&A's report with recommendations was used by the County to help stabilize the bluffs, develop a trail plan, and preserve the ecology of native systems. In 2006, P&A was contracted by the County to design a 4-mile walking trail along Shore Drive. The Trail is designed to wind around the existing trees along the route, providing a beautiful and serene recreational spot for area residents. |
Approximate File Size: 365.56KB (52Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |
Client: LandmarLocation: 4000 Ponce de Leon Blvd., St. Augustine Timeline: 2001 P&A performed an engineering due diligence property analysis that provided the client with engineering support and field evaluations, including wetland determination, assessment of permitting issues, concurrency analysis for roads and utilities, and cost analysis of phased development for design, permitting, and construction of land development and infrastructure improvements. Client: Persimmon Group Timeline: 1988 - 2001 P&A's scope of work for Persimmon included a Master Development Plan, bridge design and permitting, modification to the golf course, hotel, and residential sites, wetland mapping, surveys, and permitting with St. Johns River Water Management District and US Army Corps of Engineers. |
Approximate File Size: 384.93KB (54Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |
Client: St. Johns County Parks and Recreation Dept.Location: 2455 Palm Vally Road, Ponte Vedra, Florida Timeline: September 2002 - Present P&A provided engineering and permitting services for potable water and sanitary sewer for the Park.
| |||
Approximate File Size: 287.03KB (41Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |
Client: RIM PropertiesLocation: Clay County, Florida Timeline: 2004 - 2006 P&A performed full civil engineering services for this condo-home subdivision in Clay County. These services included due diligence and preliminary engineering to developing a master plan and preparation of subdivision and construction plans in conformance to the State, County, and environmental permitting requirements. |
Client: Todd StoneLocation: Palatka, Florida Timeline: April 2001 - August 2002 P&A provided design drawings for this climatized storage unit facility on SR 207 North of Hastings for regulatory submittal and approval, including a Stormwater Management Plan and Report designed to meet the rules and regulations of the St. Johns River Water Management District and Putnam County. Construction Plans were developed for the project depicting horizontal control, site grading, drainage, and stormwater improvements. |
Client: Woodlawn Terrace, LLCLocation: 200 South Woodlawn St. Timeline: December 2002 - present P&A prepared a site plan suitable for State funding and site plan approval from St. Johns County for this low-income apartment complex renovation project as well as detailed construction plans and specifications for permitting applications and construction bids. |
| Client: River City Homes and Development Corporation Location: Watson Road, St. Johns County Timeline: 2002 - present P&A provided complete engineering and environmental permitting, including: a Master Development Plan, site plan, and stormwater, utilities, road, and landscaping plans as well as general permitting and construction management for this 72-unit, single-family subdivision. |
| Client: RIM Properties Location: St. Augustine Shores Timeline: 2002-2004 P&A performed full land development engineering services for this multi-family condominium project in St. Augustine Shores, from master planning of the site and preparing the site plan to acquiring the required permitting. |
| Client: Florida Low Income Housing Associates Location: Citrus County Timeline: 2004 P&A was contracted to perform due diligence, site plan preparation, and to provide assistance with State funding for this low-income housing project. |
Client: St. Johns CountyLocation: 60 Davis Pond Blvd, Julington Creek Timeline: 2001 P&A provided engineering consulting services to the County for the expansion of the library parking lot and the design of a wet detention pond on the site. |
Approximate File Size: 314.95KB (44Sec. @ 56Kb/s) (Requires the FREE Adobe Acrobat Reader) |